EL17-055 - In the Matter of the Application by Crocker Wind Farm, LLC for a Permit of a Wind Energy Facility and a 345 kV Transmission Line in Clark County, South Dakota, for Crocker Wind Farm
Date of Notice of Filing: 12/21/17 ♦ Docket Closed: 05/20/19
Docket Reopened: 06/07/19 ♦ Docket Reclosed:11/14/23
Agendas:
January 3, 2018, Agenda of Commission Meeting
February 23, 2018, Agenda of Ad Hoc Commission Meeting
April 3, 2018, Agenda of Commission Meeting
June 8, 2018, Agenda of Ad Hoc Commission Meeting
July 26, 2018, Agenda of Commission Meeting
August 7, 2018, Agenda of Commission Meeting
November 27, 2018, Agenda of Commission Meeting
March 31, 2020, Agenda of Commission Meeting
January 19, 2021, Agenda of Commission Meeting
September 14, 2021, Addendum to the Agenda of Commission Meeting
June 16, 2022, Agenda of Commission Meeting
Minutes:
Minutes of January 3, 2018, Commission Meeting
Minutes of February 23, 2018, Ad Hoc Commission Meeting
Contact Precision Reporting to order a written transcript of the EL17-055 discussion
Minutes of April 3, 2018, Commission Meeting
Contact Precision Reporting to order a written transcript of the EL17-055 discussion
Minutes of June 6, 2018, Ad Hoc Commission Meeting
Contact Precision Reporting to order a written transcript of the EL17-055 discussion
Minutes of July 26, 2018, Commission Meeting
Contact Precision Reporting to order a written transcript of EL17-055 discussion
Minutes of August 7, 2018, Commission Meeting
Contact Precision Reporting to order a written transcript of EL17-055 discussion
Minutes of November 27, 2018, Commission Meeting
Minutes of March 31, 2020, Commission Meeting
Minutes of the January 19, 2021, Commission Meeitng
Minutes of the September 14, 2021, Commission Meeting
Minutes of the June 16, 2022 Commission Meeting
Click For Comments and Responses
Pre-filed Exhibits for Evidentiary Hearing
Hearing:Public Input Hearing on Monday, February 5, 2018, at 5:00 p.m., Clark American Legion Hall, 103 N. Commercial St., Clark, South Dakota
- 12/20/17 - Notice of Application; Order for and Notice of Public Input Hearing; Notice of Opportunity to Apply for Party Status
- Party Status Application
- Energy Conversion & Electric Transmission Facilities Siting Info Guide
- Recording
- Sign In Sheets
- Crocker Wind Farm's Presentation
- Marsha Hubner's Comments
- Gregg Hubner's Comments
- Doug Sombke's, South Dakota Farmers Union, Comments
- Doug Sombke's, South Dakota Farmers Union, Comments Confidential (not available to the public)
- Grant Van Gilder's Comments
- Grant Van Gilder's Comments Confidential (not available to the public)
- Ryan and Erica Caulfield's Comments
- Ryan and Erica Caulfield's Comments Confidential (not available to the public)
- Tom Wookey's Comments
- Tom Wookey's Comments Confidential (not available to the public)
- Troy Grensberg's Comments
- Troy Grensberg's comments Confidential (not available to the public)
- Kyle Christman's Comments
- Kyle Christman's Comments Confidential (not available to the public)
- Amber Christman's Comments
- Amber Christman's Comments Confidential (not available to the public)
- Beckie Caulfield's Comments
- Beckie Caulfield's Comments Confidential (not available to the public)
- Comments of Kyle Gaikowski
- Kyle Gaikowski's Comments Confidential (not available to the public)
- Robbie Orris' Comments
- Robbie Orris' Comments Confidential (not available to the public)
- Shad Stevens' Comments
- Rodney A. Christman's Comments
- Rodney A. Christman's Comments Confidential (not available to the public)
- Doug Paulson's Comments
- Doug Paulson's Comments Confidential (not available to the public)
- George L. Holborn's Comments
- George L. Holborn's Comments Confidential (not available to the public)
- Nancy Tarbox's Comments
- Nancy Tarbox's Comments Confidential (not available to the public)
- Darci Adam's Comments
- Jeffrey S. Kalo's Comments
- Dave Adam's Comments
- Dave Adam's Comments Confidential (not available to the public)
- Steven Somsen's Comments
- Jean Obermeier's Comments
- Jean Obermeier's Comments Confidential (not available to the public)
- Ted Obermeier's Comments
- Ted Obermeier's Comments Confidential (not available to the public)
- Jody Obermeier's Comments
- Jody Obermeier's Comments Confidential (not available to the public)
- Terry Schoeler's Comments
- Michael & Linda Florey's Comments
- Michael & Linda Florey's Comments Confidential (not available to the public)
- Jeff Mitchell's Comments
- Jeff Mitchell's Comments Confidential (not available to the public)
- Wendy Crabtree's Comments
- Wendy Crabtree's Comments Confidential (not available to the public)
- Wendy Christman's Comments
- Wendy Christman's Comments Confidential (not available to the public)
- Fred Rosenau's Comments
- Fred Rosenau's Comments Confidential (not available to the public)
- Fred Obermeier's Comments
- Fred Obermeier's Comments Confidential (not available to the public)
- Jean Stevens' Comments
- Gale Paulson's Comments
- Gale Paulson's Comments Confidential (not available to the public)
- Carol and Dave Finstad's Comments
- Carol and Dave Finstad's Comments Confidential (not available to the public)
- Jeff Haverly, Governor's Office of Economic Development's Comments
- Contact Precision Reporting to order a written transcript of the EL17-055 discussion.
A hearing will be held on Wednesday, May 9, 2018, through Friday, May 11, 2018, beginning at 9:00 AM. CDT, with marking exhibits to begin 8:00 A.M. CDT, on May 9, 2018, in the Matthew Training Center, Foss Building, 523 East Capitol Avenue, Pierre,
South Dakota
- 04/11/18 - Order For and Notice of Evidentiary Hearing
- 05/01/18 - Order Permitting David Hessler to Testify Telephonically
- Recordings
- May 9, 2018
- May 10, 2018
- May 11, 2018
- Sign In Sheets
- Exhibits
- Contact Precision Reporting to order written transcripts of EL17-055 discussion.
- 12/20/17 - Notice of Application; Order for and Notice of Public Input Hearing; Notice of Opportunity to Apply for Party Status
- 01/04/18 - Order Assessing Filing Fee; Authorizing Executive Director to Enter Into a Consulting Contract
- 02/26/18 - Order Granting Intervention and Party Status (Reece M. Almond, Davenport, Evans, Hurwitz & Smith, LLP - Representing: Dave Adam; Darci Adam; Nancy Tarbox; Jeff Kalo; Shad Stevens; Gale Paulson; Joe Jansen; Linda Jansen; Jean Stevens; Katrina Kalo; Robert Ward; Doug Paulson; Wendy Crabtree; Dustin Van Gilder; Sheldon Adam; Kipp Obermeier; Kimberly Paulson; Lowell Wahl; Norma Wahl; Emma Vig; Cole Vig; Kay Ward; Troy Mudgett; Heather Johannsen; Lisa Stern; Dana Nordhus; Lori Nordhus; Karen Paulson; Richard Paulson; Alan Berns; LeRoy Monson; Kasey Mehlberg; Kadie Boysen; Donette Dunlavy; Steve Huber; Margaret Nordhus; Charles Tollefson; Kathy Tollefson; Tara Huber; Jesse Huber; Brad Stevens; Allen Stern; Luke Holzwarth; Jennifer Crabtree; John D. Quinn; Steve Headley; Bonnie Headley; Aaron Hemmingsen; Connie Hemmingsen; Seth Hemmingsen; Nicole Peckham; Matt Peckham; Dean Kirkeby; Michael E. Bjerke; Russell Luvaas; Susan Handke; Kenneth Luvaas; Sally Luvaas; Amber Tarbox; Barbara E. Erickson; James E. Erickson; Steve Bjerke; Keith Tarbox; and Chelsey Granum) This order also includes the Procedural Schedule
- 04/09/18 - Order Granting Withdrawal of Party Status (Dave Adam; Darci Adam; Nancy Tarbox; Jeff Kalo; Joe Jansen; Linda Jansen; Jean Stevens; Katrina Kalo; Robert Ward; Doug Paulson; Wendy Crabtree; Dustin Van Gilder; Sheldon Adam; Kipp Obermeier; Kimberly Paulson; Lowell Wahl; Norma Wahl; Emma Vig; Cole Vig; Kay Ward; Troy Mudgett; Heather Johannsen; Lisa Stern; Dana Nordhus; Lori Nordhus; Karen Paulson; Richard Paulson; Alan Berns; LeRoy Monson; Kasey Mehlberg; Kadie Boysen; Donette Dunlavy; Steve Huber; Margaret Nordhus; Charles Tollefson; Kathy Tollefson; Tara Huber; Jesse Huber; Brad Stevens; Allen Stern; Luke Holzwarth; Jennifer Crabtree; John D. Quinn; Steve Headley; Bonnie Headley; Aaron Hemmingsen; Connie Hemmingsen; Seth Hemmingsen; Nicole Peckham; Matt Peckham; Dean Kirkeby; Michael E. Bjerke; Russell Luvaas; Susan Handke; Kenneth Luvaas; Sally Luvaas; Amber Tarbox; Barbara E. Erickson; James E. Erickson; Steve Bjerke; Keith Tarbox; and Chelsey Granum)
- 04/11/18 - Order For and Notice of Evidentiary Hearing
- 05/01/18 - Order Permitting David Hessler to Testify Telephonically
- 05/29/18 - Order For and Notice of Ad Hoc Hearing
- 06/12/18 - Final Decision and Order Granting Permit to Construct Facilities and Notice of Entry
- 08/03/18 - Order Approving Escrow Plan
- 08/09/18 - Order Approving Public Liaison Officer
- 11/29/18 - Order Approving Escrow Agreement
- 04/02/20 - Order Granting Motion To Terminate Public Liaison Services
- 09/20/21 - Order Granting Renewed Motion for Release of Road and Public Infrastructure Restoration Bond
- 12/15/17 - Crocker Wind Farm LLC's Letter regarding Application for a Permit of a Wind Energy Facility and a 345 kV Transmission Line
- Application
- Typical Turbine Drawing Confidential (not available to the public)
- Cultural Resources Map Confidential (not available to the public)
- Figures
- Figure 1 - Project Location
- Figure 2a-d - Project Layout Map Series
- Figure 3 - Transmission Facility
- Figure 4 - Site Evaluation
- Figure 5 - Project Setbacks
- Figure 5a-d - Project Setbacks (Detailed)
- Figure 6 - Surficial Geology and Economic Deposits
- Figure 7a - Bedrock and Surficial Geology Cross Sections
- Figure 7b - Bedrock and Surficial Geology Cross Sections
- Figure 8 - Soils
- Figure 9 - Hydrogeology
- Figure 10 - Surface Water Resources
- Figure 11 - Wetlands
- Figure 12 - Vegetation
- Figure 13 - Land Use
- Figure 14 - Public Lands and Recreation
- Figure 15 - Conservation Easements
- Appendix A - Typical Turbine Foundation
- Appendix B - Typical Transmission Structure Drawings
- Appendix C - Crocker Flow Direction Map Set
- Appendix D - Draft Bird and Bat Conservation Strategy
- Appendix E - Crocker Wind Farm Sound Level Assessment
- Appendix F - Crocker Wind Farm Shadow Flicker Assessment
- Appendix G - Crocker Wind Farm Telecommunications Studies (Comsearch)
- Appendix H - Crocker Wind Farm Agency Correspondence
- Appendix I - The Impact of Wind Power Projects of Residential Property Values in the United States: An Overview of Research Findings
- Appendix J - Electric and Magnetic Field (EMF) Report
- Direct Testimony of Brie Anderson
- Direct Testimony of Barry Fladeboe
- Direct Testimony of Rob Copouls
- Direct Testimony of Eddie Duncan
- Direct Testimony of Elizabeth Engelking (Also see 3/21/18 Updated Testimony)
- Direct Testimony of Michael Morris
- Direct Testimony of Mark Thayer
- Exhibit 1 - Mark Thayer's Curriculum Vitae
- Exhibit 2 - Ernest Orlando Lawrence Berkeley National Laboratory - The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis
- Exhibit 3 - Ernest Orlando Lawrence Berkeley National Laboratory - A Spatial Bedonie Analysis of the Effects of Wind Energy Facilities on Surrounding Property Values in the United States
- Exhibit 4 - Wind Farm Proximity and Property Values: Apooled Hedonic Regression Analysis of Property Values In Central Illinois
- Exhibit 5 - The Effect of Wind Farms on Residential Property Values in Lee County, Illinois
- Exhibit 6 - Impact of the Lempster Wind Power Project on Local Residential Property Values
- Exhibit 7 - Relationship Between Wind Turbines and Residential Property Values in Massachusetts
- Exhibit 8 - Energy Economics - The Windy City: Property Value Impacts of Wind Turbines In an Urban Setting
- Exhibit 9 - Values in the. Wind: A Hedonic Analysis of Wind Power Facilities
- Exhibit 10 - Ecological Economics - Understanding the Amenity Impacts of Wind Development on an International Border
- Exhibit 11 - American Real Estate Society - Wind Energy Facilities and Residential Properties: The Effect of Proximity and View on Sales Prices
- Exhibit 12 - Spatial Hedonic Analysis of the Effects of US Wind Energy Facilities on Surrounding Property Values
- Exhibit 13 - Wind Turbines, Amenities and Disamenities: A Study of Home Value Impacts in Densely Populated Massachusetts
- Exhibit 14 - Wind Turbines, Amenities and Disamenities: A Study of Home Value Impacts in Densely Populated Massachusetts
- Exhibit 15 - Wind Turbines & Property Value
- Exhibit 16 - The Impact of Wind Farms on Property Values: A Geographically Weighted Hedonic Pricing Model
- Exhibit 17 - Journal of Environmental Economics and Management - Gone With the Wind: Valuing the Visual Impacts of Wind Turbines Through House Prices
- Exhibit 18 - The Vindication of Don Quijote: The impact of noise and visual pollution from wind turbines
- Exhibit 19 - The Effects of Electric Transmission Lines on Property Values: A Literature Review
- Application
- 12/21/17 - PUC's Affidavit of Service
- 12/28/17 - Crocker Wind Farm LLC's Letter to Clark County Auditor regarding Application
- 12/28/17 - Crocker Wind Farm LLC's Letter to Day County Auditor regarding Application
- 12/28/17 - Crocker Wind Farm LLC's Letter to Spink County Auditor regarding Application
- 12/29/17 - PUC Staff's Letter to SD Newspaper Association regarding Notice of Public Hearing
- 01/04/18 - PUC Staff's First Set of Data Requests to Crocker Wind Farm, LLC Certificate of Service
- 01/25/18 - Crocker Wind Farm LLC's Proof of Mailing
- Exhibit A - Letter Sent to Landowner
- Exhibit B - List of Landowners Confidential (not available to the public)
- Exhibit C - List of Landowners Confidential (not available to the public)
- 01/25/18 - Crocker Wind Farm LLC's Responses to Staff's Data Request 1 (1-1 through 1-16)
- 02/02/18 - PUC Staff's Letter to Paige Olson - State Historic Preservation Office, Subpoena and Admission of Service
- 02/02/18 - PUC Staff's Letter to Thomas Kirschenmann - SD Department of Game, Fish and Parks, Subpoena and Admission of Service
- 02/07/18 - Clark County Courier's Affidavit of Publication (January 10, 2018 and January 31, 2018)
- 02/07/18 - Watertown Public Opinion's Affidavit of Publication (January 10, 2018 and January 31, 2018)
- 02/08/18 - Admission of Service (Thomas Kirschenmann)
- 02/09/18 - PUC Staff's Second Set of Data Requests to Crocker Wind Farm, LLC Certificate of Service
- 02/09/18 - Crocker Wind Farm LLC's Response to Commissioner Nelson's Request for Additional Information on MET Towers
- 02/21/18 - Crocker Wind Farm LLC's Response to Application for Party Status and Motion for Procedural and Scheduling Orders and Certificate of Service
- 02/26/18 - Joseph J. Jansen's Comments
- 02/27/18 - Crocker Wind Farm LLC's Letter regarding Northern Border Pipeline Company Communications
- 02/27/18 - Admission of Service (Paige Olson)
- 02/28/18 - PUC Staff's First Set of Data Requests to Intervenors Certificate of Service
- 03/01/18 - Crocker Wind Farm LLC's Letter regarding Responses to Staff's Data Request 2 dated January 24, 2018
- 03/01/18 - PUC Staff's Third Set of Data Requests to Crocker Wind Farm, LLC Certificate of Service
- 03/01/18 - Kimberly Paulson's Comments
- 03/05/18 - Doug Paulson's Comments
- Doug Paulson's Comments (not available to the public)
- 03/14/18 - Dana Nordhus, Allen Stern, and Troy Mudgett, Woodland Township Supervisors' Comments
- 03/15/18 - Lowell Wahl's Comments
- 03/15/18 - Crocker Wind Farm LLC's Letter to PUC regarding Comments Received on March 14, 2018, from Woodland Township Supervisors
- Crocker Wind Farm LLC's Template Letter Regarding Information about Geronimo Energy and the Crocker Wind Farm
- 03/19/18 - Comments of Steve Huber, Warren Township
- 03/21/18 - Crocker Wind Farm LLC's Updated Elizabeth Engelking Direct Testimony
- 03/21/18 - Withdrawal of Party Status for Specified Intervenors (Dave Adam; Darci Adam; Nancy Tarbox; Jeff Kalo; Joe Jansen; Linda Jansen; Jean Stevens; Katrina Kalo; Robert Ward; Doug Paulson; Wendy Crabtree; Dustin Van Gilder; Sheldon Adam; Kipp Obermeier; Kimberly Paulson; Lowell Wahl; Norma Wahl; Emma Vig; Cole Vig; Kay Ward; Troy Mudgett; Heather Johannsen; Lisa Stern; Dana Nordhus; Lori Nordhus; Karen Paulson; Richard Paulson; Alan Berns; LeRoy Monson; Kasey Mehlberg; Kadie Boysen; Donette Dunlavy; Steve Huber; Margaret Nordhus; Charles Tollefson; Kathy Tollefson; Tara Huber; Jesse Huber; Brad Stevens; Allen Stern; Luke Holzwarth; Jennifer Crabtree; John D. Quinn; Steve Headley; Bonnie Headley; Aaron Hemmingsen; Connie Hemmingsen; Seth Hemmingsen; Nicole Peckham; Matt Peckham; Dean Kirkeby; Michael E. Bjerke; Russell Luvaas; Susan Handke; Kenneth Luvaas; Sally Luvaas; Amber Tarbox; Barbara E. Erickson; James E. Erickson; Steve Bjerke; Keith Tarbox; and Chelsey Granum) and Certificate of Service
- 03/23/18 - Crocker Wind Farm LLC's Letter regarding 12CIV17-000017 - Stipulation for Dismissal and Order
- 03/28/18 - Crocker Wind Farm LLC's Response to Motion of Intervenors to Withdraw and Certificate of Service
- 03/28/18 - Intervenors' Pre-filed Testimonies
- 03/28/18 - Staff’s Pre-filed Testimonies
- 03/29/18 - Certificates of Service for Staff's Pre-filed Testimonies
- 04/10/18 - PUC Staff's Fourth Set of Data Requests to Crocker Wind Farm, LLC Certificate of Service
- 04/12/18 - PUC Staff's Response to Crocker Wind Farm, LLC's First Set of Data Requests Certificate of Service
- 04/13/18 - Crocker Wind Farm LLC's Pre-filed Rebuttal Testimonies
- 04/16/18 - PUC Staff's Fifth Set of Data Requests to Crocker Wind Farm, LLC Certificate of Service
- 04/27/18 - Stipulation and Request for Telephonic Testimony of David Hessler
- 05/02/18 - Staff’s Pre-filed Surrebuttal Testimony
- 05/02/18 - Staff's Witness List and Exhibit List
- 05/02/18 - Staff's Pre-filed Exhibits for Evidentiary Hearing
- 05/02/18 - Intervenors' Witness List and Exhibit List
05/0218 - Crocker Wind Farm, LLC's Witness List and Exhibit List(See Revised List Filed on 5/7/18)- 05/02/18 - Crocker Wind Farm, LLC's Pre-filed Exhibits for Evidentiary Hearing
- 05/03/18 - Notice of Appearance (Lisa M. Agrimonti)
- 05/03/18 - Intervenors' Pre-filed Exhibits for Evidentiary Hearing
- 05/03/18 - Crocker Wind Farm, LLC's Pre-filed Exhibits for Evidentiary Hearing
- 05/04/18 - Crocker Wind Farm, LLC's Letter regarding Motion to Exclude Exhibits
- 05/04/18 - Intervenors' Pre-filed Revised Exhibits for Evidentiary Hearing
- 05/04/18 - Crocker Wind Farm, LLC's Pre-filed Exhibits for Evidentiary Hearing
- 05/07/18 - Crocker Wind Farm, LLC's Updated Witness List and Exhibit List
- 05/07/18 - Staff's Response to Motion to Exclude Exhibits
- 05/29/18 - Intervenors' Post-Hearing Brief Requesting Denial of the Permit Application and Certificate of Service
- 05/29/18 - Crocker Wind Farm, LLC's Letter regarding Brief
- 05/29/18 - Staff's Post-Hearing Brief
- 06/05/18 - PUC Staff's Letter regarding Corrected Recommended Conditions
- 06/08/18 - Crocker Wind Conditions Amendments Proposed by Commissioner Nelson
- 07/10/18 - Comments of Gale Paulson
- 07/10/18 - Additional Comments of Gale Paulson
- 07/12/18 - Additional Comments of Gale Paulson and Picture
- 07/16/18 - Crocker Wind Farm, LLC's Letter regarding Decommissioning
- 07/19/18 - Staff's Response to Escrow Plan
- 08/01/18 - Crocker Wind Farm, LLC's Letter regarding Paragraph 23 of Permit Conditions
Affidavit of Melissa Schmit in Support of Request for Approval of Turbine(Refiled on 8/3/18)
Adjustments- Certificate of Service
- 08/01/18 - Crocker Wind Farm, LLC's Letter regarding Paragraph 40 of Permit Conditions
- 08/03/18 - Crocker Wind Farm, LLC's Letter regarding Paragraphs 23 and 30 of Permit Conditions
- Affidavit of Melissa Schmit Providing Notice of Turbine Adjustments Up to 325 Feet (Permit Condition Paragraph 23)
- Exhibit A - Maps of Turbine Adjustments (Permit Condition Paragraph 23)
- Exhibit A - Maps of Turbine Adjustments (Permit Condition Paragraph 23) Confidential (not available to the public)
- Exhibit B - Summary of Turbine Adjustment Requirement Compliance (Permit Condition Paragraph 23)
- Exhibit C - Addendum to the Sound Level Assessment (Permit Condition Paragraph 30(b))
- Exhibit D - Updated Shadow Flicker Assessment (Permit Condition Paragraph 30(c))
- Updated Figure 2A-D, Showing the Most Current Preconstruction Design, Layout, and Plans (Permit Condition Paragraph 30(a))
- Certificate of Service
- 08/01/18 - Crocker Wind Farm, LLC's Letter regarding Corrected Affidavit of Melissa Schmit Filed on 08/01/18
- Corrected Affidavit of Melissa Schmit in Support of Request for Approval of Turbine (Originally Filed on 8/1/18)
- Certificate of Service
- 08/07/18 - Staff's Letter Requesting Additional Information Pursuant to Permit Condition 30(d)
- 08/13/18 - Staff's Letter regarding Permit Condition 23
- Attachment - Maps Confidential (not available to the public)
- 08/17/18 - Crocker Wind Farm, LLC's Letter Response to Staff's Letter Dated August 7, 2018
- 08/30/18 - Crocker Wind Farm, LLC's Letter regarding Proof of Mailing Affidavit
- 09/10/18 -
Crocker Wind Farm, LLC's Letter regarding Proof of Mailing Affidavit(See 9/11/18 Corrected Letter)- Proof of Mailing Affidavit
- Exhibit A - Landowner Letter
- Exhibit A-1 - Final Decision and Order Granting Permit to Construct Facilities and Notice of Entry
- Exhibit A-2 - Damage Compensation Plans and Procedures Confidential (not available to the public)
- Exhibit B - Landowner Mailing List Confidential (not available to the public)
- Certificate of Service
- Proof of Mailing Affidavit
- 09/11/18 - Crocker Wind Farm, LLC's Corrected Letter regarding Proof of Mailing Affidavit
- 09/13/18 - Crocker Wind Farm, LLC's Letter regarding Final Cultural Resources Report and Stormwater Pollution Prevention Plan
- 09/21/18 - Crocker Wind Farm, LLC's Letter regarding Permit Condition No. 1
- Written Findings of the Clark County Board of Adjustment Hearing for
Conditional Use Permit - Crocker Wind Farm, LLC - United States Fish and Wildlife Service's Finding of No Significant
Impact, Crocker Wind Farm, Clark County, South Dakota - United States Fish and Wildlife Service's Waubay Wetland Management District Commercial Activities Special Use Permit, Permit No. RWBY0-8-8206
- South Dakota Department of Environment and Natural Resources'
Letter Granting of Coverage to Crocker Under General Permit Authorizing Stormwater
Discharges Associated with Construction Activities, Permit No. SDR10J175 - South Dakota Department of Environment and Natural Resources' Letter Granting of Coverage to Wanzek Construction, Inc., Under General Permit
Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J175 - Certificate of Service
- Written Findings of the Clark County Board of Adjustment Hearing for
- 09/24/18 - Crocker Wind Farm, LLC's Letter regarding Paragraph 23 of Permit Conditions
- Affidavit of Melissa Schmit Providing Notice of Turbine Adjustments
- Exhibit A - Maps of Turbine Adjustments
- Exhibit A - Maps of Turbine Adjustments Confidential (not available to the public)
- Exhibit B - Summary of Turbine Adjustment Requirement Compliance
- Exhibit C - Addendum to the Sound Level Assessment
- Exhibit D - Updated Shadow Flicker Assessment
- Updated Project Layout Maps Over 325 Feet
- Updated Project Setback Maps Over 325 Feet
- Exhibit A - Maps of Turbine Adjustments
- Certificate of Service
- Affidavit of Melissa Schmit Providing Notice of Turbine Adjustments
- 09/24/18 - Crocker Wind Farm, LLC's Letter regarding Paragraph 23 of Permit Conditions
- Affidavit of Melissa Schmit in Support of Request for Approval of Turbine Adjustment
- Exhibit A - Maps of Turbine Adjustments
- Exhibit A - Maps of Turbine Adjustments Confidential (not available to the public)
- Exhibit B - Summary of Turbine Adjustment Requirement Compliance
- Exhibit C - Addendum to the Sound Level Assessment
- Exhibit D - Updated Shadow Flicker Assessment
- Updated Project Layout Maps Under 325 Feet
- Updated Project Setback Maps Under 325 Feet
- Exhibit A - Maps of Turbine Adjustments
- Certificate of Service
- Affidavit of Melissa Schmit in Support of Request for Approval of Turbine Adjustment
- 09/25/18 - Crocker Wind Farm, LLC's Letter regarding Paragraph 9(i) of Permit Conditions
- 10/16/18 - Crocker Wind Farm LLC’s Letter regarding Corrected Updated Shadow Flicker Assessment
- 10/19/18 - Crocker Wind Farm LLC's Letter regarding Addendum to Cultural Resources Report
- Addendum to Level III Cultural Resource Survey Confidential (not available to the public)
- Certificate of Service
- 10/29/18 - Crocker Wind Farm, LLC's Letter regarding Paragraph 23 of Permit Conditions
- Affidavit of Melissa Schmit Providing Notice of Project Adjustments
- Exhibit A - Maps of Turbine Adjustments
- Exhibit A - Maps of Turbine Adjustments Confidential (not available to the public)
- Exhibit B - Summary of Turbine Adjustment Requirement Compliance
- Exhibit C - Addendum to the Sound Level Assessment
- Exhibit D - Updated Shadow Flicker Assessment
- Updated Project Layout Maps
- Updated Project Constraint Maps
- Exhibit A - Maps of Turbine Adjustments
- Certificate of Service
- Affidavit of Melissa Schmit Providing Notice of Project Adjustments
- 11/19/18 - Crocker Wind Farm, LLC's Letter regarding Escrow Agreement
- 11/19/18 - Crocker Wind Farm, LLC's Letter regarding Permit Conditions
- Clark County Consent for Utility Company to Cross a Public Road
- South Dakota Department of Transportation Utility Permit
- Clark County Zoning/Building Permits
- O&M Building
- Laydown Yard
- Turbine String A
- Turbine String B
- Turbine String C
- Turbine String D
- Turbine String E
- Turbine String F
- Turbine String G
- Turbine String H
- Turbine String I
- Turbine String J
- Federal Aviation Administration Determinations of No Hazard (Individual Determinations for Each Turbine, Meteorological Tower, and ADLS Tower)
- Certificate of Service
- 01/10/19 - Crocker Wind Farm, LLC's Letter regarding Permit Conditions
- 02/11/19 - Crocker Wind Farm, LLC's Letter regarding Paragraph 25 of the Permit Conditions
- Affidavit of Melissa Schmit In Support of Request for Approval of Transmission Line Adjustments
- Exhibit A - Maps of Transmission Line Adjustments
- Exhibit A - Maps of Transmission Line Adjustments Confidential (not available to the public)
- Exhibit B - Second Addendum to the Level III Cultural Resource Survey Confidential (not available to the public)
- Exhibit C - Maps of Transmission Line Structure Adjustment
- Exhibit C - Maps of Transmission Line Structure Adjustment Confidential (not available to the public)
- Updated Transmission Line Overview Map
- Certificate of Service
- Exhibit A - Maps of Transmission Line Adjustments
- Affidavit of Melissa Schmit In Support of Request for Approval of Transmission Line Adjustments
- 02/11/19 - Crocker Wind Farm, LLC's Letter regarding Paragraph 25 of the Permit Conditions
- 04/04/19 - Email from Intervenor Gale Paulson
- 04/30/19 - Crocker Wind Farm, LLC's Letter regarding Substation Building Permit and Decommissioning Escrow Agreement
- 05/20/19 - Docket Closed
- 06/07/19 - Crocker Wind Farm, LLC's Letter regarding Paragraph 25 of the Permit Conditions
- 08/06/19 - Crocker Wind Farm, LLC's Letter regarding Paragraph 25 of the Permit Conditions
- Affidavit of Melissa Schmit Providing Notice of Project Adjustments (will be filed later)
- Certificate of Service
- 08/07/19 - Affidavit of Melissa Schmit Providing Notice of Project Adjustment
- 11/21/19 - Crocker Wind Farm, LLC's Letter regarding Paragraphs 1 and 33 of the Permit Conditions
- 02/11/20 - Crocker Wind Farm, LLC's Letter regarding Permit Conditions 31 and 37
- 03/19/20 - Crocker Wind Farm, LLC's Letter regarding Motion to Terminate Public Liaison Services
- 01/08/21 - Crocker Wind Farm, LLC's Letter regarding Motion for Release of Road and Public Infrastructure Restoration Bond
- 03/12/21 - Crocker Wind Farm, LLC's Letter regarding Permit Condition 37
- 06/14/21 - Crocker Wind Farm, LLC's Letter regarding Permit Condition 35
- Post-Construction Bird and Bat Fatality Monitoring Study Confidential (not available to the public)
- Certificate of Service
- 09/07/21 - Crocker Wind Farm, LLC's Letter regarding Condition 9(i)
- 02/01/22 - Crocker Wind Farm, LLC's Letter regarding Permit Condition 37
- 05/23/22 - Crocker Wind Farm, LLC's Letter regarding Exemption Request and Request for Modification of Escrow Account Plan and Escrow Agreement
- 01/12/23 - Crocker Wind Farm, LLC's Letter regarding Permit Condition 37
- 11/13/23 - Crocker Wind Farm, LLC's Letter regarding Permit Condition 35
- Post-Construction Bird and Bat Fatality Monitoring Study Confidential (not available to the public)
- Certificate of Service
- 11/14/23 - Docket Reclosed
- 01/26/24 - Crocker Wind Farm, LLC's Letter regarding Permit Condition 37