HP24-001 – In the Matter of the Application by SCS Carbon Transport LLC for a Permit to Construct a Carbon Dioxide Transmission Pipeline
Date Filed: 11/18/24 ♦ Intervention Date: 01/24/25
Date of Notice of Filing: ♦ Pending
Date of Notice of Filing: ♦ Pending
Pipeline Siting Information Guide
Application for Party Status, due by 5:00 p.m. CST, January 24, 2025
Orders:
- 11/19/24 - SCS Carbon Transport LLC's Letter regarding its Application for a Permit to Construct a Carbon Dioxide Transmission Pipeline
- Application
- Appendix 7 - South Dakota Inadvertent Return Plan
- Appendix 8 - Control Center Management and Leak Detection Overview
- Appendix 9 - Emergency Response Plan (DRAFT)
- Appendix 10 - High Consequence Area Mainline Valves Confidential (not available to the public)
- Appendix 11 - Route Alternatives
- Appendix 12 - Soil Crossing Tables
- Appendix 13 - Soil Heat Transfer Study
- Appendix 14 - Wetland and Waterbody Crossings
- Appendix 15 - Threatened and Endangered Species Report
- Appendix 16 - Wetland Delineation Report
- Appendix 17 - South Dakota Noxious Weeds Management Plan
- Appendix 18 - Project Waterfowl Production Area Crossing Table
- Appendix 19 - South Dakota Dust Control Plan
- Appendix 20 - Correspondence with SDSHPO
- Appendix 21 - Unanticipated Discovery Plan (DRAFT)
- Appendix 22 - Environmental Agency Correspondences
- Appendix 23 - MCE Project Economic Report
- Appendix 24 - South Dakota Phase I Geohazards Assessment Report
- Appendix 25 - SD County Setbacks
- Alexander Lange Testimony
- Aaron DeJoia Testimony
- David Daum Testimony
- Troy Eid Testimony
- Michael Lumpkin Testimony
- Brigham McCown Testimony
- James Powell Testimony
- Jon Probst Testimony
- Erin Salisbury Testimony
- Dr. John Schmidt Testimony
- Erik Schovanec Testimony
- 11/19/24 - Applicant and Staff’s Stipulation for Additional Time to File Party Status Applications