Extended Intervention Date: 05/31/09 ♦ Docket Closed: 03/22/22
The Certification filing by TransCanada can be found in Docket HP14-001
Weekly Filing:
Weekly Filings 03/12/09 to 03/18/09
Agendas:
March 24, 2009, Agenda to Commission Meeting
May 19, 2009, Agenda to Commission Meeting
June 9, 2009, Agenda to Commission Meeting
September 8, 2009, Ad Hoc Agenda to Commission Meeting
September 23, 2009, Ad Hoc Agenda to Commission Meeting
October 6, 2009, Addendum to Commission Meeting
October 6. 2009, Agenda to Commission Meeting
February 18, 2010, Ad Hoc Agenda to Commission Meeting
May 4, 2010, Agenda to Commission Meeting
Change in Location Notice
June 26, 2018, Agenda of Commission Meeting
August 6, 2019, Agenda of Commission Meeting
March 15, 2022, Agenda of Commission Meeting
Minutes:
Minutes of March 24, 2009, Commission Meeting
Minutes of May 19, 2009, Commission Meeting
Minutes of June 9, 2009, Commission Meeting
Minutes of September 8, 2009 Ad Hoc, Commission Meeting
Minutes of September 23, 2009 Ad Hoc, Commission Meeting
Transcript of Proceedings, September 23, 2009
Minutes of October 6, 2009, Commission Meeting
Transcript of Proceedings, October 6, 2009
Minutes of February 18, 2010, Ad Hoc Commission Meeting
Transcript of Proceedings, February 18, 2010
Minutes of May 4, 2010 Commission Meeting
Transcript of May 4, 2010 Commission Meeting
Minutes of June 26, 2018, Commission Meeting
Minutes of August 6, 2019 Commission Meeting
Minutes of the March 15, 2022 Commission Meeting
Filed Applications for Party Status
Application for Party Status (Blank Form)
Orders:
- ORDER OF ASSESSMENT OF FILING FEE
- NOTICE OF APPLICATION; ORDER FOR AND NOTICE OF PUBLIC INPUT HEARINGS; AND NOTICE OF OPPORTUNITY TO APPLY FOR PARTY STATUS
- ORDER GRANTING PARTY STATUS; ORDER DENYING MOTION FOR EXTENSION OF TIME TO FILE APPLICATION FOR PARTY STATUS; ORDER EXTENDING INTERVENTION DEADLINE
- ORDER GRANTING MOTION TO ESTABLISH PROCEDURAL SCHEDULE AND ORDER GRANTING PARTY STATUS
- ORDER SETTING PROCEDURAL SCHEDULE
- ORDER GRANTING MOTION FOR EXTENSION OF TIME TO SUBMIT TESTIMONY
- ORDER GRANTING IN PART AND DENYING IN PART MOTION TO COMPEL DISCOVERY
- ORDER AMENDING ORDER GRANTING IN PART AND DENYING IN PART MOTION TO COMPEL DISCOVERY
- ORDER SETTING AMENDED PROCEDURAL SCHEDULE
- ORDER FOR AND NOTICE OF HEARING
- ORDER FOR AND NOTICE OF PUBLIC HEARING
- AMENDED ORDER FOR AND NOTICE OF PUBLIC HEARING
- ORDER ESTABLISHING BRIEFING SCHEDULE
- AMENDED ORDER ESTABLISHING BRIEFING SCHEDULE
- FINAL DECISION AND ORDER; NOTICE OF ENTRY
- ORDER APPROVING PUBLIC LIAISON OFFICER
- ORDER GRANTING IN PART MOTION TO RECONSIDER AND AMENDING CERTAIN CONDITIONS IN FINAL DECISION AND ORDER
- AMENDED FINAL DECISION AND ORDER; NOTICE OF ENTRY
- 06/28/18 - ORDER APPROVING INDEMNITY BOND
- 08/08/19 - ORDER APPROVING ADVERSE WEATHER PLAN
- 03/22/22 - Order Granting Motion to Release Road Bond, Remove Public Liaison Officer, and Accept Final Reporting
Keystone XL Pipeline Project - Draft Environmental Impact Statement (DEIS) http://keystonepipeline-xl.state.gov/archive/dos_docs/deis/index.htm
(NOTE: This link is provided for your convenience. Clicking on this link will take you to the DEIS on the U.S. Department of State's (USDOS) Keystone XL Pipeline Project Web site. The DEIS was prepared by USDOS in connection with Keystone's Presidential Permit Application to construct a cross-border pipeline.)
Open Docket:
- 03/12/09 - Application
- Exhibit A
- Mapbook Land Use/Land Cover, and Off-ROW Pipe Storage Yard Maps
- Mapbook Soils Map Units
- Mapbook Extra Workspace Areas
- Exhibit B - Construction, Mitigation, and Reclamation (CMR) Plan
- Exhibit C - Preliminary Site Specific Crossing Plans
- Exhibit D - Prefiled Direct Testimony
- Exhibit A
- 03/23/09 - Subpoena (Derric Iles)
- 03/23/09 - Subpoena (Brian Walsh)
- 03/23/09 - Subpoena (Kim McIntosh)
- 03/30/09 - Subpoena (Tom Kirschenmann)
- 04/01/09 - Notice of Public Hearing
- 04/01/09 - Letters to Newspapers: Nation's Center News, Butte County Post,
The Bison Courier, Faith Independent, Rapid City Journal, The Pioneer Review,
The Murdo Coyote, Lyman County Herald and Winner Advocate - 04/02/09 - Admission of Service (Tom Kirschenmann)
- 04/06/09 - Certificate of Service
- 04/08/09 - Admission of Service (Brian Walsh)
- 04/08/09 - Admission of Service (Kim McIntosh)
- 04/08/09 - Admission of Service (Derric Iles)
- 04/23/09 - Proof of Notice - Filing of Notices for Public Hearings (Rapid City Journal, Murdo Coyote, Black Hills Pioneer, Bison Courier, Winner Advocate, Lyman County Herald, Butte County Post, Meade County Times, Pennington County Courant, Faith Independent) (Published by TransCanada)
- 04/23/09 - Proof of Notice - Notice to Landowners (Published by TransCanada)
- 04/27/09 - Affidavit of Publication (Lyman County Herald)
- 04/27/09 - Proof of Notice - Filing of Notices for Public Hearings (The Pioneer Review)
- 05/01/09 - Two Affidavits of Publications (The Pioneer Review)
- 05/04/09 - Two Affidavits of Publications (Rapid City Journal)
- 05/04/09 - Affidavit of two Publications (Butte County Post)
- 05/05/09 - Affidavit of Publications (Winner Advocate)
- 05/06/09 - Affidavit of Publication (The Bison Courier)
- 05/06/09 - Affidavit of Publication (The Faith Independent)
- 05/07/09 - Affidavit of Publication (Nation's Center News)
- 05/11/09 - Letter and Motion for Extension of Time to File Application for Party Status
- 05/15/09 - Response to Motion to Extend Time
- 05/15/09 - Commission Staff Motion to Establish a Procedural Schedule
- 05/21/09 - Affidavit of Publication (The Murdo Coyote)
- 05/29/09 - Letter from Staff Regarding Consulting Contracts
- 06/03/09 - Proof of Notice to Landowners
- 06/11/09 - Consulting Contracts Confidential (Not Available to the Public)
- 06/29/09 - Letter from Paul Blackburn
- 08/26/09 - Letter from Brett Koenecke and Certificate of Service
- 09/03/09 - Motion for Extension of Time to Submit Testimony and Attachments
- 09/14/09 - Subpoena (Paige Hoskinson Olson)
- 09/14/09 - Subpoena (Michael Kenyon)
- 09/18/09 - Admission of Service (Paige Hoskinson Olson)
- 09/18/09 - Applicant's Response to Dakota Rural Action's Request for Further Discovery
- 09/18/09 - Affidavit of James E. Moore
- 09/21/09 - Motion to Compel Responses and Production of Documents Addressed to TransCanada Propounded by Dakota Rural Action
- 09/21/09 - Admission of Service (Michael Kenyon)
- 09/29/09 - Letter from Chairman Johnson Regard Motion to Reconsider its Decision
- 10/02/09 - Letter from Kara Semmler
- 10/09/09 - Letter from Dakota Rural Action (DRA)
- 10/14/09 - Supplemental Staff Report (Assessment of Socioeconomic Impacts)
- 10/19/09 - Revised Application
- 10/21/09 - Letter from Paul Blackburn
- 10/29/09 - Letter from Brett Koenecke
- 10/30/09 - Letter from Kara Semmler
- 11/10/09 - Letter from Tom Kirschenmann
- 11/13/09 - Applicant's Brief Addressing DRA's Offer and Withdrawal of Exhibits
- 01/13/10 - Letter from John Harter
- 01/13/10 - Letter from David Niemi
- 01/20/10 - Applicant's Initial Post Hearing Brief
- 01/20/10 - Applicant's Proposed Final Decision and Order; Notice of Entry
- 01/20/10 - Post Hearing Commission Staff Brief
- 01/21/10 - Motion to Accept Late-Filed Brief
- 01/21/10 - Initial Post-Hearing Brief of Dakota Rural Action
- 01/21/10 - Letter form Brett Koenecke
- 01/26/10 - Letter from Staff
- 02/02/10 - Post-Hearing Reply Brief of Dakota Rural Action
- 02/02/10 - Applicant's Response to David Niemi's Letter Filed on January 13, 2010
- 02/02/10 - Applicant's Brief in Response to Initial Post-Hearing Brief of Dakota Rural Action
- 02/02/10 - Applicant's Brief in Response to Post-Hearing Commission Staff Brief
- 02/02/10 - Certificate of Service
- 02/02/10 - Post Hearing Commission Staff Reply Brief
- 02/18/10 - Draft Permit Conditions
- 04/09/10 - Applicant's Motion for Limited Reconsideration of Certain Permit Conditions
- Exhibit A - General Procedural Guidance for Paleontological Resource Management
- Exhibit B - Guidance for implementing the Potential Fossil Yield Classification (PFYC) System
- Exhibit C - Potential Fossil Yield Classification (PFYC) System.
- Exhibit D - Guidelines for Assessment and Mitigation of Potential Impacts to Paleontological Resources
- 04/19/10 - David Niemi's Response to Request for Reconsideration
- 04/19/10 - Paul Seaman's Response to Request for Reconsideration
- 04/27/10 - Motion for Approval of Public Liaison Officer
- 04/27/10 - Applicant's Reply Brief in Support of Motion for Limited Reconsideration
- 04/27/10 - Letter and Certificate of Certificate
- 04/28/10 - Staff's Response to Motion for Reconsideration
- 04/29/10 - Answer of DRA in Opposition to Applicant's Motion for Limited Reconsideration of Certain Permit Conditions
- 05/04/10 - Letter from Jerry Roitsch regarding the Liaison's Role
- 07/30/10 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2010
- 11/01/10 - Keystone XL Pipeline Quarterly Report, Ending September 30, 2010
- 01/03/11 - Letter from TransCanada to Keystone Landowners
- 01/06/11 - Letter from Dean Wagner, Chairman of the Harding County Board of Commissioners
- 01/18/11 - Filing Request from Bret Clanton
- 01/31/11 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2010
- 04/29/11 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2011
- 07/13/11 - Tripp County Commissioners' Letter regarding Approaches and Road Improvements on Various Roads in Tripp County
- 07/29/11 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2011
- 10/31/11 - Keystone XL Pipeline Quarterly Report, Ending September 30, 2011
- 02/01/12 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2011
- 04/26/12 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2012
- 07/27/12 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2012
- 10/31/12 - Keystone XL Pipeline Quarterly Report, Ending October 31, 2012
- 05/01/13 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2013
- 05/02/13 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2012
- 07/29/13 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2013
- 10/30/13 - Keystone XL Pipeline Quarterly Report, Ending September 30, 2013
- 01/30/14 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2013
- 01/30/14 - Liaison Annual Report 2013
- 04/30/14 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2014
- 07/29/14 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2014
- 11/03/14 - Keystone XL Pipeline Quarterly Report, Ending October 31, 2014
- 01/15/15 - 2011 Keystone Pipeline Liaison Annual Report
- 01/15/15 - 2012 Keystone Pipeline Liaison Annual Report
- 01/26/15 - Keystone XL Pipeline's Letter regarding Liaison Annual Report 2014
- 01/30/15 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2014
- 04/30/15 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2015
- 07/30/15 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2015
- 10/30/15 - Keystone XL Pipeline's Letter regarding Report
- 01/29/16 - Keystone XL Pipeline's Letter regarding Liaison Annual Report 2015
- 05/02/16 - Keystone XL Pipeline Liaison Quarterly Report, January 1 through March 31, 2016
- 05/03/16 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2016
- 05/06/16 - Keystone XL Pipeline's Letter regarding Liaison Sarah Metcalf's Contact Information
- 07/28/16 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2016
- 10/31/16 - Keystone XL Pipeline Quarterly Report, Ending September 30, 2016
- 01/27/17 - Peter Jaskoski, TransCanada's Email regarding Application for Presidential Permit
- 01/27/17 - Peter Jaskoski, TransCanada's Email regarding Application for Presidential Permit
- 01/31/17 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2016
- 04/24/17 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2017
- 08/01/17 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2017
- 01/23/18 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2017
- 04/18/18 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2018
- 06/15/18 - Applicant's Motion to Approve Indemnity Bond and Certificate of Service
- 06/25/18 - South Dakota Energy Facility Permit Act Bond and Power of Attorney - BDTO-860041-018
- 07/24/18 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2018
- 10/29/18 - Keystone XL Pipeline Quarterly Report, Ending September 30, 2018
- 10/30/18 - Amended Keystone XL Pipeline Quarterly Report, Ending September 30, 2018
- 01/25/19 - Keystone XL Pipeline Quarterly Report, Ending December 31, 2018
- 04/10/19 - Keystone XL Pipeline's Letter regarding Presidential Permit
- 04/30/19 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2019
- 07/22/19 - Keystone XL Pipeline's Letter regarding Motion to Approve Adverse Weather Plan
- 04/30/19 - Keystone XL Pipeline Quarterly Report, Ending March 31, 2019
- 07/30/19 - Keystone XL Pipeline's Letter and Liaison Quarterly Report, April 1 through June 30, 2019
- 07/31/19 - Keystone XL Pipeline Quarterly Report, Ending June 30, 2019
- 11/06/19 - Keystone XL Pipeline's Letter and Quarterly Report, Ending September 30, 2019
- 11/06/19 - Keystone XL Pipeline's Letter and Liaison Quarterly Report, July 1 through September 30, 2019
- 01/28/20 - Keystone XL Pipeline's Letter and Quarterly Report, Ending December 31, 2019
- 01/28/20 - Keystone XL Pipeline's Letter and Liaison Quarterly Report, October 1 through December 31, 2019
- 02/04/20 - Keystone XL Pipeline's Letter regarding TC Energy's Letter to SDPUC Commissioners
- Keystone XL Pipeline’s Letter regarding Condition 10
- 02/28/20 - In the Matter of Water Application No. 2793-2, TransCanada Keystone Pipeline, LP
- 02/28/20 - In the Matter of Water Application No. 1986-1, TransCanada Keystone Pipeline, LP
- 02/28/20 - In the Matter of Water Application No. 2792-2, TransCanada Keystone Pipeline, LP
- 04/08/20 - Keystone XL Pipeline's Letter regarding Water Permits
- 04/30/20 - Keystone XL Pipeline's Letter and Liaison Quarterly Report, January 1 through March 31, 2020
- 04/30/20 - Keystone XL Pipeline's Letter and Quarterly Report, Ending March 31, 2020
- 05/18/20 - Keystone XL Pipeline's Letter regarding Condition 28
- 05/20/20 - Keystone XL Pipeline's Letter regarding Permits
- SDDENR’s Contractor Authorization Acknowledgement and General Permit Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J115
- SDDENR’s Notice of Intent Acknowledgement and General Permit Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J115
- SDDENR’s Notice of Intent Acknowledgement and General Permit Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J583
- United States Department of the Interior’s Final Biological Opinion
- SDDENR’s Notice of Intent Acknowledgement and General Permit Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J762, Spread 6A/6B
- SDDENR’s Notice of Intent Acknowledgement and General Permit Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J770, Pump Station 20 Winner
- SDDENR’s Notice of Intent Acknowledgement and General Permit Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J771, Pump Station 19 Murdo
- SDDENR’s Notice of Intent Acknowledgement and General Permit Authorizing Stormwater Discharges Associated with Construction Activities, Permit No. SDR10J772, Pump Station 15 Harding
- 05/20/20 - Keystone XL Pipeline's Letter regarding Condition 2
- Harding County Haul Route Agreement
- Perkins County Haul Route Agreement
- Butte County Haul Route Agreement
- Meade County Haul Route Agreement
- Pennington County Haul Route Agreement
- Haakon County Haul Route Agreement
- Jones County Haul Route Agreement
- Lyman County Haul Route Agreement
- Tripp County Haul Route Agreement
- Brule County Haul Route Agreement
- Gregory County Haul Route Agreement
- 05/20/20 - Keystone XL Pipeline's Letter regarding Corrected Access Road List
- 05/20/20 - Keystone XL Pipeline's Letter regarding Paleontological Resource Mitigation Plan
- Data Transmittal Cover Page Confidential (not available to the public)
- Paleontological Resources Monitoring and Mitigation Plan, South Dakota, 2019 Confidential (not available to the public)
- 05/20/20 - Keystone XL Pipeline's Letter regarding Condition 11, Preconstruction Conference
- 06/08/20 - Keystone XL Pipeline's Letter regarding Condition 29, Winterization Plan
- 06/23/20 - Keystone XL Pipeline's Letter regarding Conditions 6 and 16(o)
- Landuse/Landcover Map Book
- Landowner List Confidential (not available to the public) (excel format)
- 07/01/20 - Keystone XL Pipeline's Letter regarding Condition 2
- 07/28/20 - Keystone XL Pipeline's Letter regarding Condition 2
- 07/29/20 - Keystone XL Pipeline's Letter and Liaison Quarterly Report, April 1 through June 30, 2020
- 07/29/20 - Keystone XL Pipeline's Letter and Quarterly Report, Ending June 30, 2020
- 10/28/20 - Keystone XL Pipeline's Letter and Liaison Quarterly Report, July 1 through September 30, 2020
- 10/28/20 - Keystone XL Pipeline's Letter and Quarterly Report, Ending September 30, 2020
- 11/02/20 - Sound Dakota Department of Environment and Natural Resources’ Rescission of Temporary Permits
- 12/22/20 - SDDENR’s Rescission of Temporary Permit to Use Public Waters for Construction, Testing and Drilling Purposes
- 01/27/21 - Keystone XL Pipeline's Letter and Liaison Quarterly Report, October 1 through December 31, 2020
- 01/27/21 - Keystone XL Pipeline's Letter and Quarterly Report, Ending December 31, 2020
- 08/12/21 - Keystone XL Pipeline's Letter and Liaison Quarterly Reports, January 1 - March 31, 2021 and April 1 through June 30, 2021
- 08/12/21 - Keystone XL Pipeline's Letter and Quarterly Report, Ending June 30, 2021
- 12/21/21 - Keystone XL Pipeline’s Letter and Liaison Quarterly Report, Year End 2021
- 12/21/21 - Keystone XL Pipeline’s Letter and Final Report for the Period Ending December 21, 2021
- 12/21/21 - Applicant’s Motion to Release Road Bond, Approve Removal of Public Liaison Officer and Accept Final Reporting and Certificate of Service
- 03/08/22 - Redacted County Haul Road Agreement Terminations
- 03/08/22 - Affidavit of Brock Taylor
- Exhibit A - Annual Township Meeting
- Exhibit B - Scovil Township Haul Route Agreement Release
- Certificate of Service
- 03/09/22 - Certificate of Service of the Redacted County Haul Road Agreement Terminations
- 03/22/22 - Docket Closed