Consumer Assistance | Energy | Telecom | Warehouse | Commission Actions | Miscellaneous
arrow Commission Agendas | previous page

South Dakota Public Utilities Commission Meeting
November 20, 2018, at 1:30 p.m. CST

Room 413, Capitol Building
Pierre, South Dakota

NOTE:  Docket participants who wish to join this meeting by conference call, should contact the Commission at 605-773-3201 by 5:00 p.m. CST on Monday, November 19, 2018, to reserve a phone line. Lines are limited and assigned on a first come, first served basis, subject to possible reassignment to accommodate persons who must appear in a proceeding. Ultimately, if you wish to participate in docket discussion at the Commission Meeting and a line is not available, you may have to appear in person. 

NOTE:  To listen to the Commission Meeting live please go to the PUC’s website www.puc.sd.gov and click on the LIVE link on the home page. The Commission requests persons who will only be listening to proceedings and not actively appearing in a case listen via the webcast to free phone lines for those who have to appear.  The Commission meetings are archived on the PUC’s website under the Commission Actions tab. Click on “Commission Meeting Archives,” to access the recordings.

NOTE: Notice is further given to persons with disabilities that this Commission meeting is being held in a physically accessible place. If you have special needs, please notify the Commission and we will make all necessary arrangements.

AGENDA OF AD HOC COMMISSION MEETING

Electric

1.     EL18-026     In the Matter of the Application by Prevailing Wind Park, LLC for a Permit of a Wind Energy Facility in Bon Homme County, Charles Mix County and Hutchinson County, South Dakota, for the Prevailing Wind Park Project (Staff Analysts: Darren Kearney, Jon Thurber; Staff Attorney: Kristen Edwards)

On May 30, 2018, Prevailing Wind Park, LLC filed an application to construct the Prevailing Wind Park Project (Project), a wind energy facility located on approximately 50,364 acres of land in Bon Homme, Charles Mix and Hutchinson counties, South Dakota, between the towns of Avon, Tripp, and Wagner, South Dakota. The total installed capacity of the Project would not exceed 219.6 MW nameplate capacity. The proposed Project includes up to 61 wind turbine generators, access roads to turbines and associated facilities, underground electrical power collector lines connecting the turbines to the collection substation, an operation and maintenance facility, and temporary construction areas, including crane paths, public road improvements, a laydown yard, and a concrete batch plant(s) (as needed), and four permanent meteorological towers. The Project would interconnect at Western Area Power Administration’s existing Utica Junction Substation, located approximately 27 miles east of the Project. A public input meeting was held on July 12, 2018. On August 9, 2018, the Commission issued an order granting intervention to six individuals and one county government. One individual filed a late application for party status, which was granted by the Commission. An evidentiary hearing (Hearing) was held October 9–12, 2018. The Commission received post-hearing briefs from the parties on November 13, 2018.

     TODAY, shall the Commission grant, deny, or grant with conditions, a permit for the construction of a wind energy facility to Prevailing Wind Park, LLC pursuant to SDCL 49-41B-25? OR, how shall the Commission proceed?

/s/Cindy Kemnitz     .
Cindy Kemnitz
Finance Manager
PUC Email
November 14, 2018