Consumer Assistance | Energy | Telecom | Warehouse | Commission Actions | Miscellaneous

arrow  Pipeline Safety | previous page


PHMSA Advisory Bulletins
(current as of May 2024)

Date Advisory Bulletin # Title
06/02/22 ADB-2022-01 Potential for Damage to Pipeline Facilities Caused by Earth Movement and Other Geological Hazards
06/10/21 ADB-2021-01 Pipeline Safety: Statutory Mandate To Update Inspection and Maintenance Plans To Address Eliminating Hazardous Leaks and Minimizing Releases of Natural Gas From Pipeline Facilities
09/29/20 ADB-2020-01 Pipeline Safety: Inside Meters and Regulators
09/29/20 ADB-2020-02 Pipeline Safety: Overpressure Protection on Low-Pressure Natural Gas Distribution Systems
05/02/19 ADB-2019-02 Potential for Damage to Pipeline Facilities Caused by Earth Movement and Other Geological Hazards
04/11/19 ADB-2019-01 Potential for Damage to Pipeline Facilities Caused by Flooding, River Scour, and River Channel Migration
04/10/17 ADB-2017-02 Guidance on Training and Qualifications for the Integrity Management Program
03/16/17 ADB-2017-01 Pipeline Safety: Deactivation of Threats
12/13/16 ADB-2016-07 High Consequence Area Identification Methods for Gas Transmission Pipelines
12/09/16 ADB-2016-06 Safeguarding and Securing Pipelines from Unauthorized Access
08/16/16 ADB-2016-05 Clarification of Terms Relating to Pipeline Operational Status
06/21/16 ADB-2016-04 Ineffective Protection, Detection, and Mitigation of Corrosion Resulting From Insulated Coatings on Buried Pipelines
02/11/16 ADB-2016-03 Dangers of Abnormal Snow and Ice Build-Up on Gas Distribution Systems
02/05/16 ADB-2016-02 Safe Operations of Underground Storage Facilities for Natural Gas
01/19/16 ADB-2016-01 Potential for Damage to Pipeline Facilities Caused by Flooding, River Scour and River Channel Migration
06/23/15 ADB-2015-02 Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes
04/09/15 ADB-2015-01 Potential for Damage to Pipeline Facilities Caused by Flooding, River Scour and River Channel Migration
10/15/14 ADB-2014-05 Guidance for Strengthening Pipeline Safety Through Rigorous Program Evaluation and Meaningful Metrics
09/18/14 ADB-2014-04 Guidance for Pipeline Flow Reversals, Product Changes, and Conversion to Service
09/12/14 ADB-2014-03 Construction Notification
05/06/14 ADB-2014-02 Lessons Learned from the Release at Marshall, Michigan
01/28/14 ADB-2014-01 Improvements in Preparing Oil Spill Facility Response Plans
10/31/13 ADB-2013-03A Notice: Correction of Advisory Bulletin for Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems
08/28/13 ADB-2013-04 Notice to Operators of Hazardous Liquid and Natural Gas Pipelines of a Recall on Leak Repair Clamps Due to Defective Seal
07/18/13 ADB-2013-03 Reminder of Requirements for Utility LP-Gas and LPG Pipeline Systems
07/12/13 ADB-2013-02 Potential for Damage to Pipeline Facilities Caused by Flooding
01/30/13 ADB-2013-01 Telephonic Notification Time Limit to NRC
12/21/12 ADB-2012-11 Reporting of Exceedances of Maximum Allowable Operating Pressure
12/05/12 ADB-2012-10 Using Meaningful Metrics in Conducting Integrity Management Program
10/11/12 ADB-2012-09 Communications During Emergency Situations
07/31/12 ADB-2012-08 Inspection and Protection of Pipeline Facilities after Railway Accidents
06/11/12 ADB-2012-07 Mechanical Fitting Failure Reports
05/07/12 ADB-2012-06 Verification of Records
03/23/12 ADB-2012-05 Cast Iron Pipe (Supplementary Advisory Bulletin)
03/21/12 ADB-2012-04 Implementation of the National Registry of Pipeline and Liquefied Natural Gas Operators
03/06/12 ADB-2012-03 Notice to Operators of Driscopipe 8000 High Density Polyethylene Pipe of the Potential for Material Degradation
02/23/12 ADB-2012-02 Post Accident Drug and Alcohol Testing
01/13/12 ADB-2012-01 Implementation of the National Registry of Pipeline and Liquefied Natural Gas Operators
09/01/11 ADB-11-05 Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes
07/27/11 ADB-11-04 Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding
07/12/11 ADB-11-07 Pipeline Safety; Enforcement Proceedings Involving an Informal Hearing
05/17/11 ADB-11-03 Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements
02/09/11 ADB-11-02 Pipeline Safety: Dangers of Abnormal Snow and Ice Build-Up on Gas Distribution Systems
01/10/11 ADB-11-01 Establishing Maximum Allowable Operating Pressure or Maximum Operating Pressure Using Record Evidence, and Integrity Management Risk Identification, Assessment, Prevention, and Mitigation
11/03/10 ADB-10-08 PHMSA-2010-0307: Pipeline Safety: Emergency Preparedness Communications
08/31/10 ADB-10-07 PHMSA-2010-0226; Liquefied Natural Gas Facilities: Obtaining Approval of Alternative Vapor-Gas Dispersion Models
08/03/10 ADB-10-06 Pipeline Safety: Personal Electronic Device Related Distractions
06/28/10 ADB-10-05 PHMSA-2010-0175- Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill
04/29/10 ADB-10-04 PHMSA-2008-0211 - Pipeline Safety: Implementation of Electronic Filing for Recently Revised Incident/Accident Report Forms for Distribution Systems, Gas Transmission and Gathering Systems, and Hazardous Liquid Systems
03/24/10 ADB-10-03 PHMSA-2010-0078 Pipeline Safety: Girth Weld Quality Issues Due to Improper Transitioning, Misalignment, and Welding Practices of Large Diamater Line Pipe
02/03/10 ADB-10-02 PHMSA-2008-0211: Implementation of Revised Incident/Accident Report Forms for Distribution Systems, Gas Transmission and Gathering Systems, and Hazardous Liquid Systems
01/26/10 ADB-10-01 PHMSA-2009-0421: Pipeline Safety: Leak Detection on Hazardous Liquid Pipelines
01/19/10 ADB-09-04 PHMSA-2009-0408: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator Identification Numbers
12/07/09 ADB-09-03 PHMSA-2009-0349; Pipeline Safety: Operator Qualification (OQ) Program Modifications
09/30/09 ADB-09-02 PHMSA-2009-0158;Weldable Compression Coupling Installation
05/21/09 ADB-09-01 PHMSA-2009-0148; Pipeline Safety: Potential Low and Variable Yield and Tensile Strength and Chemical Composition Properties in High Strength Line Pipe.
11/24/08 ADB-08-08 PHMSA-2008-0300; Pipeline Safety: Proper Identification of Internal Corrosion Risk; Notice; Issuance of Advisory Bulletin
07/31/08 ADB-08-07 PHMSA-RSPA-1997-2426; National Pipeline Mapping System; Notice; Issuance of Advisory Bulletin
07/02/08 ADB-08-06 Dynamic Riser Inspection, Maintenance, and Monitoring Records on Offshore Floating Facilities.
06/25/08 ADB-08-05 Notice to Hazardous Liquid Pipeline Operators of Request for Voluntary Advance Notification of Intent To Transport Biofuels
06/05/08 ADB-08-04 Pipeline Safety: Installation of Excess Flow Valves into Gas Service Lines
05/13/08 ADB-08-01 Notice to Operators of Gas Transmission Pipelines on the Regulatory Status of Direct Sales Pipelines
03/10/08 ADB-08-03 Dangers of Abnormal Snow and Ice Build-up on Gas Distribution Systems
03/04/08 ADB-08-02 Issues Related to Mechanical Couplings Used in Natural Gas Distribution Systems
02/29/08 ADB-07-01 Pipeline Safety: Updated Notification of the Susceptibility to Premature Brittle–Like Cracking of Older Plastic Pipe
09/06/07 ADB-07-01 Updated Notification of the Susceptibility to Premature Brittle-like Cracking of Older Plastic Pipe
04/23/07 ADB-07-01 Senior Executive Signature and Certification of Integrity Management Program Performance Reports
12/28/06 ADB-06-04 Lessons Learned From a Security Breach at a Liquefied Natural Gas Facility
11/22/06 ADB-06-03 Notice to Operators of Natural Gas and Hazardous Liquid Pipelines to Accurately Locate and Mark Underground Pipelines Before Construction-Related Excavation Activities Commence
06/16/06 ADB-06-02 Submission of Public Awareness Programs
01/17/06 ADB-06-01 Advisory on Operator Qualifications for Excavation Activities
09/07/05 ADB-05-07 Potential for Damage to Natural Gas Distribution Pipeline Facilities Caused by the Passage of Hurricane Katrina
09/07/05 ADB-05-08 Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricane Katrina
08/11/05 ADB-05-06 Countermeasures to Prevent Human Fatigue in the Control Room
08/10/05 ADB-05-05 Inspecting and Testing Pilot-Operated Pressure Relief Valves
07/29/05 ADB-05-04 Integrity Management Notifications for Gas Transmission Lines
05/23/05 ADB-05-03 Planning for Coordination of Emergency Responses to Pipeline Emergencies
04/06/05 ADB-05-02 Strapping Table Calibration for Breakout Tank Operators
01/21/05 ADB-05-01 Semi-Annual Reporting of Performance Measures for Gas Transmission Pipeline Integrity Management
11/26/04 ADB-04-05 Modifications to OQ programs for individuals performing covered tasks on gas and hazardous liquid pipeline facilities
09/29/04 ADB-04-01 Hazards Associated with de-watering of pipelines
09/23/04 ADB-04-04 Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricane Ivan
08/18/04 ADB-04-03 Unauthorized excavations and the installation of third-party data acquisition devices on underground pipeline facilities
07/22/04 ADB-04-02 Semi-Annual Reporting of Performance Measures for Gas Transmission Pipeline Integrity Management
12/23/03 ADB-03-09 Potential Service Disruptions in Supervisory Control and Data Acquisition Systems
11/25/03 ADB-03-08 Self-Assessment of Pipeline Operator Public Education Programs
11/17/03 ADB-03-07 Guidance On When The Baseline Integrity Assessment Begins
11/12/03 ADB-03-06 Corrosion Threat to Newly Constructed Gas Transmission and Hazardous Liquid Pipelines
10/08/03 ADB-03-05 Stress Corrosion Cracking (SCC) Threat to Gas and Hazardous Liquid Pipelines
09/05/03 ADB-03-04 Pipeline Industry Implementation of Effective Public Awareness Programs
07/17/03 ADB-03-03 Identified Sites as Part of High Consequence Areas for Gas Integrity Management Programs
02/03/03 ADB-03-02 Required Submission of Data to the National Pipeline Mapping System Under the Pipeline Safety Improvement Act of 2002
01/22/03 ADB-03-01 Updates of Digital Mapping Data for Hazardous Liquid Pipeline High Consequence Areas
12/03/02 ADB-02-07 Notification of the Susceptibility to Premature Brittle-Like Cracking of Older Plastic Pipe; Notice; correction
11/26/02 ADB-02-07 Notification of the Susceptibility to Premature Brittle-Like Crackin of Older Plastic Pipe
10/18/02 ADB-02-06 Definition of Onshore Gas Gathering Lines
09/10/02 ADB-02-05 Safety of Liquefied Petroleum Gas (LPG) Distribution Systems
09/06/02 ADB-02-04 Telephonic Notification to National Response Center
07/17/02 ADB-02-02 Revised Natural Gas Transmission Pipeline Incident and Annual Report Forms
06/13/02 ADB-02-03 Gas and Hazardous Liquid Pipeline Mapping
06/05/02 ADB-02-01 (02) Revised Natural Gas Transmission Pipeline Incident and Annual Report Forms
05/24/02 ADB-02-01 Notice to Operators of Natural Gas and Hazardous Liquid Pipelines To Encourage Continued Implementation of Safe Excavation Practices
05/21/01 ADB-01-02 Emergency Plans and Procedures for Responding to Multiple Gas Leaks and Migration of Gas into Buildings
03/09/01 ADB-01-01 Closure of Gas Shut-Off Valves Serving Permanently Moored Vessels (PMV) During High-water Condition
09/05/00 ADB-00-02 Internal Corrosion in Gas Transmission Pipelines
10/01/99 ADB-99-02 Potential failures due to cracking of plastic pipe in natural gas systems
09/01/99 ADB-99-01 Potential failures due to cracking of plastic pipe manufactured by Century Utility Products, Inc.
08/27/99 ADB-99-04 Directional Drilling and Other Operations Conducted in Proximity to Underground Pipeline Facilities
07/16/99 ADB-99-03 Potential Service Interruptions in Supervisory Control and Data Acquisition Systems
11/30/98 ADB-98-04 September 15, 1998, deadline to mark OCS pipeline facilities where operating responsibility transfers from a production operator to a transportation operator.
11/12/98 ADB-98-03 Damage potential from Hurricane Georges
08/07/98 ADB-98-01 Potential Computer Problems Related to the Year 2000 (Y2K)
11/12/97 ADB-97-05 Potential Failure of Check Valves Following Remanufacturing
07/10/97 ADB-97-04 Underground Storage of Natural Gas or Hazardous Liquids
03/04/97 ADB-97-03 Potential Soil Subsidence on Pipeline Facilities
01/24/97 ADB-97-01 Potential Damage to Pipelines by Impact of Snowfall, and Actions Taken by Homeowners and Others to Protect Gas Systems from Abnormal Snow Build-up
08/09/95 ADB-95-02 Increased Pipeline Transportation Security Measures
05/12/95 ADB-95-01 Auditing of Drug and Alcohol Plans by Consortiums or Third Party Administrators
11/02/94 ADB-94-05 Pipelines Affected by Flooding
02/23/94 ADB-94-03 Pipelines in a common right-of-way, parallel right-of-way, or cross a rail right-of-way
01/19/94 ADB-94-02 Valve Location and Spacing
01/13/94 ADB-94-01 Certain Requirements Applying to Supplemental Incident/Accident Reports and Estimated Property Damage Totals
12/10/93 ADB-93-05 Drug Testing Information
11/16/93 ADB-93-04 Persons Seeking Interpretations of Pipeline Safety Regulations Include Certain Information
07/29/93 ADB-93-03 Advisory to Owners and Operators of Hazardous Liquid and Natural Gas Pipeline Facilities in Areas of Flooding
04/09/93 ADB-93-02 Advisory to Owners and Operators of Gas Distribution and Gas Transmission Facilities; Continuing Educational Program for Gas Customers and the Public
02/03/93 ADB-93-01 Pipeline Safety Advisory Bulletin; Snow Accumulation on Gas Pipeline Facilities
08/23/92 ADB-92-01 Potential damage to Pipelines by Hurricane Andrew
01/26/92 ALN-92-02 Addresses concerns arising from Allentown, P A, explosion
01/08/92 ALN-92-01 Lightning-induced electrical discharge from tracer wire to plastic pipe.
11/20/91 ALN-91-04 NTSB recommendations S P-91-3/P-91-4, 03/15/90 NY leak/explosion: Requiring operators to extend their public education/emergency preparedness programs
10/22/91 ALN-91-03 NTSB SR P-91-2 Texas Eastern Product Pipeline Company Explosion 2/20/90: Actions to be taken before moving a pipeline
10/11/91 ALN-91-02 NTSB recently issued recommendation P-91-12 related to the August 1990 explosion and fire in Allentown, PA, caused by a crack in a 4-inch cast iron gas main.
04/15/91 ALN-91-01 Reemphasize each pipeline operator's responsibility to report promptly; ciriteria specified in 49 CFR 191.5/195.52
04/09/90 ALN-90-01 Advise offshore water operators of recurring safety problems involving marine vessel operations and crew safety
04/13/89 ALN-89-02 Results of OPS-conducted investigation of the San Bernardino, CA, 05/12/89 train derailment; each gas/liquid operator should test check valves.
03/08/89 ALN-89-01 Update: Additional findings relative to factors contributing to operational failures of pipelines constructed by ERW prior to 1970
01/28/88 ALN-88-01 Recent findings relative to factors constributing to operational failures of pipelines constructed with ERW prior to 1970
03/13/87 ALN-87-01 Incident involving the fillet welding of a full encirclement repair sleve on a 14" API 5LX-52 pipeline; King of Prussia, PA 10/07/86 pipeline failure
02/26/86 ADB-86-02 Plastic Piping, Mechanical Coupling
12/01/84 84-3 First Joint Meeting of Liquid and Gas Technical Committees
07/01/84 84-2 Operators of Gas Pipelines New Reporting Requirements
04/01/84 84-1 Annual Report for Pipeline Safety
07/01/83 83-2 Gas Appliance Technology Center to be Established
04/01/83 83-1 California PUC Imposes Penalty on PG&E for Safety Violations
12/01/82 82-2 Texas Pipeline Safety Special Operations Van
09/01/82 82-1 Guidance Manual for Operators of Small Gas Systems
04/01/81 81-2 Notices and Amendments
02/01/81 81-1 Notices and Amendments
12/01/80 80-4 New Rules are Issued for Safer LNG Plant Operation
10/01/80 ALN-80-04 Use of stainless steel band clamps for permanent repair of damaged plastic pipe.
09/01/80 80-3 Notices and Amendments to the Safety Regulations
07/01/80 80-2 Assessment of Arctic Offshore Pipelines Report Available from NTIS
05/01/80 80-1 Recent Notices and Amendments to the Safety Regulations
12/01/79 79-5 Amendment to the Natural Gas Pipeline Safety Act of 1968
10/01/79 79-4 Recent Notices of Proposed Rulemaking to Federal Pipeline Safety Precautions
07/01/79 79-3 Pumping Unit Airlifted to Alaska
04/01/79 79-2 NTSB Reports on Donnellson, Iowa Gas Explosion
02/01/79 79-1 Recent Notices of Proposed Rulemaking to Federal Pipeline Safety Regulations
09/01/78 78-5 Notices, Amendments, and Withdrawals Published During August and September
07/01/78 78-4 NTSB Issues Report on Pipeline Accident on Alyeska Pipe Station No. 8
03/01/78 78-3 Santman Testifies Before House Subcommittee on Energy and Power (LNG spills)
02/01/78 78-2 Standards Issues for Conversion of Existing Pipelines to Liquid Service
01/01/78 78-1 OPSO Seeking Gas and Liquid Pipeline Engineers
12/01/77 77-12 OPSO Issues Proposed Rule for Qualification of Design of Steel Pipe
11/01/77 77-11 Issues Correction to Final Rule on Longitudinal Seams in Pipe Bends
10/01/77 77-10 Denies Petition for Reconsideration of Rule Governing corrosion Control of Metal Alloy Fittings in Plastic Pipelines
09/01/77 77-9 OPSO Proposes Deleting Requirement that Longitudinal Seams on Adjacent Pipe Lengths be Offset
08/01/77 77-8 Period Extended for Commenting on Proposed Standards for LNG Facilities
07/01/77 77-7 Standards on Corrosion Control for Metal Alloy Fittings in Plastic Pipelines Issued
06/01/77 77-6 Pipeline Operators Found Delinquent in Making Telephone Notices of Reportable Leaks
05/01/77 77-5 OPSO Issues Corrections to Notice on LNG
04/01/77 77-4 OPS Issues Notice on Conversion of Existing Pipeline to Gas Service
03/01/77 77-3 DOT Continues Monitoring of Taps
02/01/77 77-2 Notice Issued on Proposed Plastic Pipe Amendment to Federal Gas Safety Standards
01/01/77 77-1 Advance Notice Issued on Pipeline Occupational Safety and Health Standards
12/01/76 76-12 DOT Grants Waiver on Three Alyeska Welds, Denial on 31
11/01/76 76-11 Natural Gas Pipeline Safety Act Amended
10/01/76 76-10 MTB Proposes to Amend Gas Pipeline Safety Standards Relating to Corrosion Control for Small Metal Fittings in Plastic Pipelines
09/01/76 76-9 Trans-Alaska Crude Oil Pipeline Petitions for Waiver on Certain Girth Welds
08/01/76 76-8 Federal Gas Pipeline Safety Standards Amended for Offshore Facilities
07/01/76 76-7 OPSO Clarifies Corrosion Control Requirement for Gas Pipelines Installed Before 8/1/1971
06/01/76 76-6 Federal Gas Pipeline Safety Standards Amended for Sealing Caulked Bell and Spigot Joints
05/01/76 76-5 1975 Reports on Deaths and Injuries Resulting from Gas Pipeline Failures
04/01/76 76-4 Federal Gas and Liquid Pipeline Safety Standards Amended to Bring up to Date Certain Incorporated References
03/01/76 76-3 NTSB Reports on Mississippi Gas Gathering Pipeline Failure (PAR-76-1)
02/01/76 76-2 NTSB Reports on New Mexico Gas Transmission Pipeline Failure (PAR-75-3)
01/01/76 76-1 OPSO Proposes to Amend Gas and Liquid Pipeline Standards for Bending Steel Pipe
12/01/75 75-12 NTSB Recommends Corrective Actions Subsequent to Investigation of Texas Gas Processing Plant Failure
11/01/75 75-11 OPSO Proposes to Modify Gas Pipeline Safety Standards for Cast Iron Joint Sealants
10/01/75 75-10 OPSO Extends Comment Periods and Will Conduct Hearing on Proposed Amendments For Offshore Pipeline Facilities
09/01/75 75-9 OPSO Issues Notice Which Proposes to Amend Gas Pipeline Safety Standards for Offshore Facilities
08/01/75 75-8 NTSB Reports on Virginia Gas Transmission Pipeline Failure
07/01/75 75-7 Welding Requirements for Gas and Liquid Pipelines, Modified to Include Depth of Undercutting Standards
06/01/75 75-6 OPS Grants Waiver for the Trans-Alaska Crude Oil Pipeline
05/01/75 75-5 Clarification of Leak Detector Fluid - Consumer Product Safety Commission
04/01/75 75-4 Requirements for Marking Gas Transmission Lines Revised; New Marking Requirements for Gas Distribution Mains Issued
03/01/75 75-3 Welding Requirements for Gas and Liquid Pipelines Updated
02/01/75 75-2 Regulations on Qualification of Pipe Transported by Rail Updated
01/01/75 75-1 NTSB Reports on Bowie, Maryland Gas Explosions (PAR-74-5)
12/01/74 74-12 Secretary Requests Governors' Support on Prevention of Damage to Pipelines
11/01/74 74-11 OPS Extends Comment Period for Notices on Offshore Pipelines and Gathering
10/01/74 74-10 74-10 OPS Issues NPRM Relating to Offshore Pipeline Facilities
09/01/74 74-9 74-9 Announces Two 5-day Courses on Gas Pipeline Safety in OKC
08/01/74 74-8 74-8 New Welding Requirements for Gas and Liquid Pipelines - Withdraws Notice
07/01/74 74-7 74-7 OPS Issues ANPRM on NSTB recommendations - Clinton, MO cast iron incident
06/01/74 74-6 74-6 Liquid Pipeline Safety Standards Amended for Movement of Pipelines Containing Liquefied Gases
05/01/74 74-5 74-5 Issues NRPM to update standards on pipeline welding for gas and liquid pipelines
04/01/74 74-4 74-4 Additional OPS/State Agency Gas Pipeline SEminars Announced
03/01/74 74-3 74-3 Annoucement of 1.75 Million in Grants to States
02/01/74 74-2 74-2 NPRM on Transportation of long joints of pipe by railroad
01/01/74 74-1 74-1 Odorization of gas in transmission lines extended
12/01/73 73-12 73-12 Corrections to instructions for completing annual report for distribution system
11/01/73 73-11 73-11 OPS Mails Instructions for Annual Report Form Preparation
10/01/73 73-10 73-10 Secretary Appointments to TAC
09/01/73 73-9 73-9 Schedule of OPS/State Agency Gas Pipeline Safety Seminars Announced
08/01/73 73-8 73-8 DeLeon Named Deputy Director of OPS
07/01/73 73-7 73-7 Additional State/OPS Seminars for Gas Operators Announced
06/01/73 73-6 73-6 Interim Standards for Gas Odorization in Transmission Lines Extended
05/01/73 73-5 73-5 Fifth Annual Summary of Liquid Pipeline Accident Reports
04/01/73 73-4 73-4 Data on Corrosion Caused Pipeline Failures Discussed at Annual NACE Conference
03/01/73 73-3 73-3 Liquid Pipeline Safety Regulations amended to require telephonic notice of accidents
02/01/73 73-2 73-2 Amends Part 192 with additional provisions for qualifications of pipe
01/01/73 73-1 73-1 Liquid Pipeline Carrier Accident Report Now Should go to OPS
12/01/72 72-12 72-12 Announces Consolidation of pipeline safety functions in OPS
11/01/72 72-11 72-11 Safety Jurisdiction over "direct sale pipelines" clarified
10/01/72 72-10 72-10 Additional Safeguards of deactivation of service lines and abandonment or inactivation of gas pipelines
09/01/72 72-9 72-9 Time Extended for odorization of gas in transmission lines
08/01/72 72-8 72-8 Amendments to NGPSA
07/01/72 72-7 72-7 Notice of Extended Comment Period - Additional Markings for Gas Pipelines
06/01/72 72-6 72-6 TPAC
05/01/72 72-5 72-5 Additional Marking Requirements for Gas Pipelines
04/01/72 72-4 72-4 TPAC
03/01/72 72-3 72-3 Coverage of Petroleum and Transmission Pipelines
02/01/72 72-2 72-2 Annual Report Not Required for Small Petroleum Gas Distribution Systems
01/01/72 72-1 72-1 Odorizing gas in transmission lines
12/01/71 71-4 71-4 Capacity of pressure relieving and limiting stations
11/01/71 71-3 71-3 Corrosion Pitting
10/01/71 71-2 Extension Granted on MAOP Confirmation or Revision
09/01/71 71-1 Petition to Modify Corrosion control Requirements for Cast Iron Pipe Denied