South Dakota Public Utilities Commission Meeting
May 9, 2019, at 9:00 a.m. CDT
Room 423, Capitol Building
Pierre, South Dakota
NOTE: If you wish to join this meeting by conference call, please contact the Commission at 605-773-3201 by 9:00 a.m. CDT on Wednesday, May 8, 2019. Lines are limited and are given out on a first come, first served basis, subject to possible reassignment to accommodate persons who must appear in a proceeding. Ultimately, if you wish to participate in the Commission Meeting and a line is not available you may have to appear in person.
NOTE: To listen to the Commission Meeting live please go to the PUC’s website www.puc.sd.gov and click on the LIVE link on the home page. The Commission requests persons who will only be listening to proceedings and not actively appearing in a case listen via the web cast to free phone lines for those who have to appear. The Commission meetings are archived on the PUC’s website under the Commission Actions tab, Click on “Commission Meeting Archives,” to access the recordings.
NOTE: Notice is further given to persons with disabilities that this Commission meeting is being held in a physically accessible place. If you have special needs, please notify the Commission and we will make all necessary arrangements.
AGENDA OF AD HOC COMMISSION MEETING
Electric
1. EL19-003 In the Matter of the Application by Crowned Ridge Wind, LLC for a Permit of a Wind Energy Facility in Grant and Codington Counties (Staff Analysts: Darren Kearney, Jon Thurber, Eric Paulson; Staff Attorneys: Kristen Edwards, Amanda Reiss)
On January 30, 2019, Crowned Ridge Wind, LLC (Crowned Ridge or Applicant) filed an application for a permit to construct a wind energy conversion facility to be located in Grant County and Codington County, South Dakota (Project). The Project would be situated on approximately 53,186-acres in the townships of Waverly, Rauville, Leola, Germantown, Troy, Stockholm, Twin Brooks, and Mazeppa, South Dakota. The total installed capacity of the Project would not exceed 300 megawatts (MW) of nameplate capacity. The proposed Project includes up to 130 wind turbine generators, access roads to turbines and associated facilities, underground 34.5-kilovolt (kV) electrical collector lines, underground fiber-optic cable, a 34.5-kV to 345-kV collection substation, one permanent meteorological tower, and an operations and maintenance facility. The Project will utilize the Crowned Ridge 34-mile 230-kV generation tie line and a new reactive power compensation substation to transmit the generation from the Project’s collector substation to the Project’s point of interconnection located at the Big Stone South 230-kV Substation, which is owned by Otter Tail Power Company. Applicant has executed a power purchase agreement with Northern States Power Company (NSP) to sell NSP the full output of the Project. The Project is expected to be completed in 2020. Applicant estimates the total cost of the Project to be $400 million. The Commission has granted party status to four individuals (Intervenors). On April 25, 2019, Intervenors filed Intervenors’ Motion to Deny and Dismiss. On April 30, 2019, PUC staff and Crowned Ridge filed responses to the Motion.
TODAY, shall the Commission grant Intervenors’ Motion to Deny and Dismiss?
Public Comment
Individuals who wish to make public comments to the commission may do so in person during this time. All who offer public comment are requested to sign in at the commission meeting. Time limits for comments may be determined at the discretion of the chairman.
/s/Cindy Kemnitz .
Cindy Kemnitz
Finance Manager
PUC Email
May 2, 2019