PHOTOS FROM STORK TWIN CITY TESTING COPORATION
- Grain Structure Examination (GSE) Photos
- G- OD Surface metallography at 50X 0
- G- OD Surface metallography at 50X 1
- G- OD Surface metallography at 50X 2
- Isometric close-up view of groove at crack
- Isometric view of exposed crack end
- Isometric view of exposed crack end_edited-1
- Left of weld at 50X cropped
- Left of weld at 50X
- Macro of cross section of surface groove at fracture
- NG- OD surface metallography at 50X 0
- NG- OD surface metallography at 50X 1
- NG- OD surface metallography at 50X 2
- Right of weld at 50X cropped
- Right of weld at 50X
- surface groove at fracture close-up
- surface groove at fracture overall
- Weld at 50X cropped
- Weld at 50X
- Weld seam inside surface
- On-Site
Photos
- Mitchell Incident Pipe Picture Index
- On-site DSC01419
- On-site DSC01420
- On-site DSC01421
- On-site DSC01422
- On-site DSC01423
- On-site DSC01424
- On-site DSC01425
- On-site DSC01426
- On-site DSC01427
- On-site DSC01429
- On-site DSC01430
- On-site DSC01431
- On-site DSC01432
- On-site DSC01433
- On-site DSC01444
- On-site DSC01445
- On-site DSC01446
- On-site DSC01447
- On-site DSC01448
- On-site DSC01449
- On-site DSC01450
- On-site DSC01589
- On-site DSC01590
- On-site DSC01591
- On-site DSC01592
- On-site DSC01593
- On-site DSC01594
- SEM EDS Photos Data
- SEM BEI Sample 1 at 100X
- SEM BEI Sample 2 at 100X
- SEM BEI Sample 3 at 100X
- SEM BEI Sample 4 at 100X
- SEM BEI Sample 5 at 100X
- SEM BEI Sample 6 at 100X
- SEM BEI Sample 7 at 100X
- SEM BEI Sample 8 at 100X
- SEM EDS Sample 1
- SEM EDS Sample 2
- SEM EDS Sample 3
- SEM EDS Sample 4
- SEM EDS Sample 5
- SEM EDS Sample 6
- SEM EDS Sample 7
- SEM EDS Sample 8 dark
- SEM EDS Sample 8
- Visual Examination Photos
- Coating at combined 7 and 13+
- Coating condition 7 in. from End A after
- Coating condition 7 in. from End A
- Coating condition 13+ in. from End A after
- Coating condition 13+ in. from End A
- Coating condition 42 in. from End A
- Coating condition at 21 in. from End A at right
- Crack 1
- Crack 2
- Crack 3
- Crack 4
- Crack 5
- Crack 6
- Crack 6A
- Crack 7
- Crack 8
- Crack 9
- Crack 10
- Crack 11
- Crack 12
- Crack at 28 in. from End A
- Crack calibration
- Crack end back view
- End A with tape
- End A
- End B including crack
- End B
- Isometric close-up view of groove at crack
- Isometric view of exposed crack end_edited-1
- Overall crack 1
- Overall crack back view
- Overall crack side
- Overall crack
- Overall opposite crack
- Pipe deflection close-up- crack down
- Pipe deflection end view- crack up
- Pipe deflection front view- crack up
- Pipe deflection isometric view- crack down
- Pipe ID surface after cleaning
- Pipe ID surface after cleaning
- Section cut from End B for tensile
- surface groove at fracture overall
- Table examination set-up